A Colorado Framework for Power Water Infrastructure and Community Benefit
By John R. Lucero
September 24, 2026
Data centers have moved from largely invisible infrastructure to one of Colorado’s most consequential development questions. The shift is not simply about artificial intelligence. It is about land, electricity, water, infrastructure, public incentives and the obligations a major project owes to the community that hosts it.
I have spent much of my career working where economic development, real estate and public policy meet, including fourteen years on the Denver Board of Water Commissioners. The current debate feels familiar. Public officials want investment. Utilities need enough certainty to build capacity. Developers want a predictable approval process. Residents want assurance that they will not pay higher utility bills or absorb environmental impacts for a project that delivers limited local benefit.
Those interests are not inherently in conflict. Colorado can welcome data-center investment without giving away the public balance sheet. The governing principle should be straightforward: a project should proceed when it can demonstrate a reliable resource plan, pay the full costs it creates and deliver a measurable public benefit.
Data Centers Are Real Estate Before They Are Technology
The cloud still occupies land. A large data center requires a site, entitlements, power generation and transmission capacity, substations, water or another cooling strategy, backup generation, fiber connections, security and emergency planning. Once those systems are added together, the project begins to look less like an ordinary warehouse and more like a privately operated utility-scale campus.
Scale matters. A small edge facility serving local users is not the same land-use proposition as a hyperscale campus built to train artificial-intelligence models. Colorado should not regulate every server room as though it were a 100-megawatt project. But once a proposal reaches a level that can materially affect utility planning, water demand or surrounding neighborhoods, ordinary industrial zoning is no longer enough.
The national electricity numbers explain the urgency. The U.S. Department of Energy reports that data centers consumed about 4.4 percent of total U.S. electricity in 2023 and could consume between 6.7 and 12 percent by 2028. Colorado’s nonpartisan Legislative Council Staff also notes that the typical long-term employment impact is relatively modest compared with the capital investment and resource demand, citing an estimate of roughly 43 operating jobs per 100 megawatts of capacity. Construction employment and tax revenue are real benefits, but they should not be confused with the permanent job creation of a conventional employment center.
Colorado Has Already Framed the Choice
The 2026 General Assembly considered the issue from opposing directions. House Bill 26-1030 offered a twenty-year state sales and use tax exemption, with a possible ten-year extension, for qualifying projects that met investment, job, labor, efficiency and water-stewardship requirements. Senate Bill 26-102 emphasized cost responsibility, long-term utility contracts, electricity and water reporting, local model codes and community protections for large-load facilities. Both bills were postponed indefinitely.
Denver then adopted a one-year moratorium on accepting or processing certain applications where a data center would be the primary use. The pause was understandable: the zoning code did not provide a purpose-built framework for facilities whose off-site impacts may be larger than their physical footprint. But moratoria are a pause, not a policy. The work now is to define the conditions under which a good project can proceed.
| 2026 action | Primary approach | Policy lesson |
| HB 26-1030 | Long-term tax incentives tied to investment and operating standards | Colorado wants the investment but has not agreed on how much public subsidy it should receive |
| SB 26-102 | Large-load cost responsibility reporting resource standards and local safeguards | Resource and ratepayer protections need a statewide baseline |
| Denver 26-0431 | One-year pause on specified new data-center applications | Local zoning was not designed for the scale and external impacts of modern facilities |
The First Rule Is That Existing Customers Should Not Subsidize the Project
The most important policy question is not whether a data center uses a great deal of electricity. It is who pays for the generation, transmission, substation and interconnection capacity required to serve it, and who carries the risk if the project is delayed, downsized or abandoned.
Xcel Energy’s proposed Colorado Large Load Tariff offers a useful starting point. The proposal would require large customers to cover project-related infrastructure, make minimum monthly payments, enter long-term commitments typically lasting at least fifteen years, provide financial security and pay termination charges if they leave early. Those are not punitive requirements. They are the basic protections any prudent lender or development partner would expect when one user’s project causes hundreds of millions of dollars in long-lived infrastructure to be built.
Colorado should make these protections durable and statewide. A project-specific substation should not become a residential ratepayer obligation because a technology company changes strategy three years later. Capacity reservations should require deposits and enforceable milestones. Speculative duplicate requests submitted to several utilities should not be treated as firm demand. The utility plan should be real before the land-use approval becomes irreversible.
Water Cannot Be a Footnote
Water is not a secondary environmental issue in Colorado. It is an underwriting constraint. Cooling design can materially change a facility’s water consumption, and a low-water system may require more electricity. A credible review therefore has to examine the combined water and energy strategy rather than accepting a broad promise that the project will be efficient.
At a minimum, an applicant should disclose the proposed cooling technology, annual and peak-day water demand, potable and non-potable sources, expected discharge, drought-stage operations and the water demand associated with future phases. The provider should confirm that the required supply and delivery capacity exist. If new facilities are needed, the project should fund them. If recycled or non-potable water is proposed, the conveyance and treatment plan should be enforceable rather than aspirational.
This is also where my years at Denver Water shape my view. A utility cannot responsibly commit tomorrow’s capacity based only on today’s average demand. It must plan for drought, system redundancy, fire protection, treatment limitations and the needs of customers who are already here. A project that works only during normal conditions has not completed its water plan.
Economic Development Incentives Need a Net Benefit Test
Data centers can expand the property-tax base, create substantial construction work and support well-paid technical and maintenance positions. They can also strengthen the digital infrastructure used by businesses, universities and public agencies. Those are legitimate economic-development benefits.
But incentives should follow a documented public return, not the size of the announcement. Because these projects are capital intensive and employ comparatively few people after construction, the traditional cost-per-job analysis is incomplete. Colorado should evaluate the net fiscal benefit after subtracting tax exemptions, public infrastructure, utility incentives and opportunity costs. Local governments should also ask whether the site could support another use with more jobs, housing or taxable activity.
Any incentive should be performance based. Benefits should be released only after verified investment, construction milestones, local hiring, operating commitments and resource standards are met. Clawbacks should apply when the project is not completed or the promised public benefit disappears. A sales-tax exemption lasting decades should not be treated as an entry ticket simply because competing states offer one.
Local Governments Need a Real Development Review
A data-center ordinance should create a clear approval path rather than an informal negotiation conducted after the site is already under contract. The review should be scaled to the project’s measurable impacts and should address at least the following:
- The full campus plan, including phases, ultimate electric load and the consequences of future expansion.
- Written utility confirmation of the power-service path, required upgrades, customer security and construction schedule.
- A water budget identifying cooling technology, supply, drought operations and any new treatment or distribution facilities.
- Noise, heat, air emissions, backup generation, hazardous materials, fire response and neighborhood compatibility.
- Site design, building mass, screening, landscaping, truck access, fiber routes and setbacks from sensitive uses.
- A fiscal-impact analysis showing revenues, incentives, public costs and permanent employment.
- A community-benefit agreement when a project is located in or affects a disproportionately impacted community.
The goal is not to make approval impossible. It is to eliminate surprises. Developers benefit when requirements are known before land is purchased and capital is committed. Communities benefit when promises are converted into enforceable conditions.
A Colorado Framework Built Around Full Cost
Colorado does not need to choose between an open door and a locked gate. It needs a common baseline that preserves local land-use authority while preventing a race to transfer costs onto residents. I would organize that framework around seven standards.
| Area | Minimum standard | Public purpose |
| Power | Prove a feasible service path before final land-use approval | Avoid approvals for demand the system cannot reliably serve |
| Cost | Pay all project-caused generation transmission interconnection and water-system costs | Prevent cost shifting to existing customers |
| Security | Use deposits minimum payments long-term contracts and exit charges | Protect against stranded infrastructure |
| Water | Disclose full demand cooling source drought operations and future phases | Protect supply reliability and potable water |
| Land use | Apply impact-based siting design noise emission and emergency standards | Protect neighboring uses and public health |
| Incentives | Require a net-benefit analysis performance milestones and clawbacks | Pay only for verified public value |
| Transparency | Publish annual resource use compliance and community commitments | Allow regulators and residents to measure results |
The State and Local Roles Should Be Clear
The state should establish the utility protections that cannot work if every community negotiates separately: cost-causation rules, financial-security requirements, large-load reporting and common definitions. It should also create a uniform method for evaluating incentives so that communities can compare projects on the same basis.
Local governments should retain authority over land use, water commitments, site design, public safety, fiscal impacts and community benefits. Conditions will differ between Denver, Aurora, a rural county and a community seeking to reuse a retired industrial site. A statewide floor does not require a statewide zoning code.
That division would provide what both communities and responsible developers need: consistent resource rules and locally accountable development decisions. It would also reduce the patchwork of moratoria and one-off negotiations that now creates uncertainty for everyone.
The Right Question
The public conversation is often reduced to whether Colorado is for or against data centers. That is the wrong question. The real question is whether a proposed project can carry its own costs and produce enough durable value to justify the land, utility capacity, water and public support it requires.
A well-structured data center can be a valuable part of Colorado’s economy. A poorly structured one can leave residents paying for oversized infrastructure while receiving fewer jobs and less public benefit than they were promised. The difference will not be determined by the technology inside the building. It will be determined by the development agreement around it.
Colorado should welcome the projects that can meet that test and be willing to reject the ones that cannot.
Sources and Further Reading
U.S. Department of Energy 2024 Report on U.S. Data Center Energy Use
Colorado General Assembly HB 26-1030 Data Center and Utility Modernization
Colorado General Assembly SB 26-102 Large Load Data Centers
Denver City Council File 26-0431 Data Center Moratorium
Xcel Energy Colorado Proposed Large Load Tariff April 2026
About the Author
John R. Lucero is founder and principal of Lucero Development Services, Inc. and has more than 30 years of experience in real estate and economic development, including service as Deputy Director of Denver’s Office of Economic Development. His work focuses on housing, public-private partnerships, development finance and public policy.